50
Eaton 93PM Integrated Battery Cabinet (IBC-L, IBC-LH [432V], and IBC-LH [480V]) Installation Manual 164000228—Rev 08
5.
Route the battery detect interface wiring from the UPS battery detect (building alarm) interface terminals
through the top of the IBC sidecar and the top IBC inter-cabinet wiring access pass-through (see
to the IBC battery interface terminal block TB3.
6.
Proceed to
7.
Bottom Entry Wiring.
Remove the bottom conduit plate (see
) from the inside bottom of the
IBC. Identify all conduit requirements and mark their location. Drill and punch all conduit holes in the
bottom conduit plate prior to mounting on the IBC. Install the conduit plate and install all conduit runs into
the plate. Pull the wiring through the conduit into the wiring areas.
NOTE
In multiple IBC installations, route the battery interface wiring between IBCs through the
top of the adjacent IBC using the top inter-cabinet access pass-through (see
).
8.
Route the battery detect interface wiring from the UPS battery detect (building alarm) interface terminals
through the bottom of the IBC to the IBC battery interface terminal block TB2.
9.
Connect the battery detect interface wiring to the IBC battery detect interface terminals. See paragraph
and
for termination requirements.
For a detailed view of the IBC terminal block, see
or
.
10. Connect the battery detect interface wiring to the UPS battery detect interface (building alarm) terminals.
Refer to the applicable Eaton 93PM UPS Installation and Operation manual listed in paragraph
, for UPS cabinet termination requirements.
11. Proceed to paragraph