14
Green Motion Fleet & Green Motion Building
GREEN MOTION FLEET & BUILDING
www.eaton.com
Replace the three access panels
starting with the top panel .
STEP C-12
STEP C-13
1
2
3
If you are installing a second EV charger onto the same EV pedestal, then skip to Section D.
!
Reconnect power to the upstream
circuit by switching circuit breaker
to the ON position
Energize the loadcenter or the
panelboard . The EV charger
electronics should power
immediately, and the LCD will
indicate the status of the charger .
BEFORE ENERGIZING WALL CHARGER, RE-CHECK ALL ELECTRICAL
CONNECTIONS AFTER ALL WIRING HAS BEEN COMPLETED
Installation is complete.
Turn to page 17 to commission
the EV charger.