11
Installation Guide
GREEN MOTION FLEET & BUILDING
www.eaton.com
Construct the pedestal mount conduit assembly
by pressing the 1” trade size conduit (3” length)
(1)
into the 1-inch trade size 90-degree conduit
fitting
(2)
.
Place an o-ring
(3)
on the 90-degree fitting
(2)
Slide the pedestal mount conduit assembly
(4)
onto the lineside conductors
(5)
and up into
the EV charger
(6)
, where it press-fits .
Feed the lineside conductors
(1)
through the opening in the pedestal
and through the 1" conduit locknut
(2)
.
Insert the conduit assembly
(3)
into the pedestal and connect the
locknut
(2)
to it .
STEP C-5
STEP C-6
Reference:
1
.
1” trade size conduit
2
.
90° conduit fitting
3
.
O-ring
4
.
Conduit assembly
5
.
Lineside conductors
6
.
EV charger
Reference:
1
.
Lineside conductors
2
.
1” conduit locknut
3
.
Conduit assembly
1
2
3
4
6
1
3
2
5