background image

1

Installation Guide

GREEN MOTION FLEET & BUILDING

   www.eaton.com

3x

6

9

 1.

   Charger unit with 1” conduit fitting-preinstalled 

with 36” 3 wires and adapter plate attached

•  9.6 kW:  L1/L2 - 8 AWG, GND - 10AWG 
•  19.2 kW:  L1/L2 - 6AWG, GND - 8AWG

 2.

  Premium cord holster

 3.

   Twist-Resistant  Anchor

 4.

  Steel Hex Head Screw

 5.

  Stainless Steel Hex Head Screw

 6.

  Polaris Lug

 7.

  Custom Ethernet Adapter

 8.

  1/2” Trade Size conduit fitting

 9.

  1/2” Trade Size conduit, 10 1/2” length

 10.

  1/2” Trade Size 90 degree conduit fitting

 11.

  1/2” O-ring

 12.

  1/2” Trade Size conduit fitting locknut

 13.

  1” Trade size conduit, 3” length

 14.

  1” Trade Size 90 degree conduit fitting

 15.

  1” O-ring

 16.

  1” Trade Size conduit fitting locknut

 17.

  T25 Torx  wrench

Product introduction

Eaton Green Motion chargers (AC Level 2) deliver fast and cost-effective 
charging for passenger vehicles and medium-duty trucks used for last mile 
delivery. Combining breakout capabilities for metering, control, integrated 
communications and access control with flexible installation options.

Package contents

1

2

7

8

11

2x

Pedestal installations only.

Wall installations only.

15

5

6x

12

16

10

13

14

3

7x

4

7x

Product Family

SKU

Description

Green Motion Building

GMEV40CME1B-WC

9 .6 kW AC Level 2, 40 A at 240 Vac, Wi-Fi, Ethernet

GMEV40CMC1B-WC

9 .6 kW AC Level 2, 40 A at 240 Vac, Ethernet, cellular

Green Motion Fleet

GMEV80CME1B-WC

19 .2 kW AC Level 2, 80 A at 240 Vac, Wi-Fi, Ethernet

GMEV80CMC1B-WC

19 .2 kW AC Level 2, 80 A at 240 Vac, Ethernet, cellular

Note: Additional SKUs are offered for the above products (example: GMEV40CME1B-WC-XX) where ‘XX’ is the identifier of CPO provider

1: Use Torx wrench (17) to disassemble adapter plate

17

Содержание Green Motion Fleet

Страница 1: ...Installation guide Green Motion Fleet Green Motion Building Green Motion chargers...

Страница 2: ...ALLATION Safety information 3 General reference 4 A Preparing the EV charger s 5 B Mount an EV charger to a wall 6 C Mount an EV charger to a pedestal 9 D Mount a second EV charger to a pedestal 15 FC...

Страница 3: ...Green Motion chargers AC Level 2 deliver fast and cost effective charging for passenger vehicles and medium duty trucks used for last mile delivery Combining breakout capabilities for metering control...

Страница 4: ...ehicle connected EVSE ready Long Blue Short Blue No Blink Blue Long Red Vehicle charging state EVSE not ready 1 Charging Fault 2 No Blink Green Medium Blue Vehicle connected Idle Ready READY CHARGE FA...

Страница 5: ...G IN ELECTRIC VEHICLES ONLY PREMISE VENTILATION NOT REQUIRED THIS DEVICE SHOULD BE SUPERVISED WHEN USED AROUND CHILDREN WARNING TURN OFF OR DISCONNECT THE POWER SUPPLYING THIS EQUIPMENT BEFORE BEGINNI...

Страница 6: ...and not more than 4 ft 1 2 m above the floor level for indoor loca tions and 24 inches 600 mm above the grade level for outdoor locations WARNING Risk of Explosion This equipment has arcing or sparkin...

Страница 7: ...ar of the charger and then remove the front cover 2 Unscrew the two bolts 1 on the side of the adapter plate and remove the plate 2 Set the bolts aside for now If a SIM card is not needed then skip th...

Страница 8: ...Section C Reference 1 Adapter plate 2 M6 screws x4 3 Anchor x4 Reference 1 EV charger 2 Adapter plate 3 Bolts x2 B Mount an EV charger to a wall Use the adapter plate 1 as a template mark the hole pat...

Страница 9: ...to the junction box and connect inside the junction box Suggest using the Polaris lugs provided in the kit for wiring inside the junction box Secure the cover of the junction box 4 STEP B 5 1 4 3 2 F...

Страница 10: ...tor assembly 2 STEP B 7 Reference 1 1 2 trade size conduit 2 Connector assembly 3 Ethernet port 4 EV charger Optional Assemble the custom Ethernet adapter connector 1 the 1 2 o ring 2 and the 1 2 NPT...

Страница 11: ...ments Reconnect power to the upstream circuit by switching circuit breaker to the ON position Energize the loadcenter or the panelboard The EV charger electronics should power immediately and the LCD...

Страница 12: ...e with the EV pedestal With that hardware install the premium cord holster 3 onto the pedestal using 1 4 20 hex head bolts washers and serrated flange nuts 4 Install the adapter plate 5 onto the front...

Страница 13: ...embly 4 onto the lineside conductors 5 and up into the EV charger 6 where it press fits Feed the lineside conductors 1 through the opening in the pedestal and through the 1 conduit locknut 2 Insert th...

Страница 14: ...e conduit 5 into the assembly 6 STEP C 8 Reference 1 Ethernet cable 2 1 2 plastic nut 3 Small opening in EV pedestal 4 1 2 NPT 90 degree adapter 5 10 5 conduit 6 Connector assembly 7 Ethernet port Opt...

Страница 15: ...ired lengths and connect them with their respective power cables using two Polaris lugs 1 Install a ring terminal on the EV charger ground conductor and connect it to the pedestal ground stud 1 Secure...

Страница 16: ...stal then skip to Section D Reconnect power to the upstream circuit by switching circuit breaker to the ON position Energize the loadcenter or the panelboard The EV charger electronics should power im...

Страница 17: ...to the pedestal 2 using the ten speed screws 3 Install the last bolt washer and nut 4 to the plate assembly Repeat Steps C 3 through C 11 to mount the second EV charger STEP D 1 STEP D 2 Reference 1 B...

Страница 18: ...le access panel 3 1 4 20 hex head bolts 1 4 washers 1 4 20 locknuts 4 Mid panel assembly 5 Lower access panel 6 EV pedestal 7 10 speed screws STEP D 4 STEP D 5 Reconnect power to the upstream circuit...

Страница 19: ...ourself If the unit requires servicing please contact Eaton customer service The installation maintenance and servicing of your EV charger must only be performed by qualified personnel in accordance w...

Страница 20: ...material for three 3 year from the date of original purchase In the event any Product fails to comply with the foregoing warranty Seller will at its option either a repair or replace the defective Pro...