8
Green Motion Fleet & Green Motion Building
GREEN MOTION FLEET & BUILDING
www.eaton.com
Thread the Ethernet cable
through
the 1/2” trade size conduit
(1)
and
and the connector assembly
(2)
.
Plug the Ethernet cable into the
port
(3)
on the EVcharger
(4)
.
Screw the connector assembly
(2)
to the EV charger
(4)
.
Push the conduit
(1)
into the
connector assembly
(2)
.
STEP B-7
Reference:
1
.
1/2” trade size conduit
2
.
Connector assembly
3
.
Ethernet port
4
.
EV charger
Optional
Assemble the custom Ethernet adapter connector
(1)
, the
1/2” o-ring
(2)
, and the 1/2” NPT conduit straight adapter
(3)
together as a unit .
Remove the cap
(4)
of the Ethernet port
on the EV charger
(5)
.
STEP B-6
Reference:
1
.
Custom Ethernet adapter connector
2
.
1/2” o-ring
3
.
NPT conduit straight adapter
4
.
Cap
5
.
EV charger
Steps B-6 and B-7 are optional: RJ45 (Ethernet) cable wiring
!
B7 Bubble
4
3
2
1
5
3
2
4
Optional
B6 Main
1