8

6   First commissioning and modifying  network settings

Installation and Operating Instructions  Web-Controller

   40071860236 (E)   February 2019   www.eaton.com

With opener contact

Resistor must be connected next to the switch.

1 kOhm

S1 CGLine

S2 Interface

Option inputs (In1/In2):

Programmable digital inputs. The inputs are activated by 

bridging of both contacts of In1 or In2.
The following functions can be freely assigned to the digi-

tal inputs:

O

O

Rest order

O

O

Maintained Light ON/OFF per Line

O

O

Start function test

O

O

Stop test

O

O

External failure

Relay outputs:

The  Web-Controller also has 2 freely program-

mable relay outputs each with a change-over contact.
Programmable functions:

O

O

At least one luminaire failure

O

O

Three consecutive luminaire failure

O

O

Communication failure

O

O

Battery operation

O

O

Function test active

O

O

Duration test active

O

O

Charging failure

O

O

Test failure

Assignment:

Relay 1: 

Relay 2:

21

22

24

11

12

14

USB connections:

The  Web-Controller has 2 USB connections: 1 x 

USB A host and 1 x USB B device.

USB1 (Type A host):

A standard USB storage stick can be connected to this 

USB port to save the current configuration and the log-

book to the USB stick.

USB2 (Type B device):

This USB connection enables connection of the  

Web-Controller to a standard PC. Controller functions can 

be programmed via the PC and a configuration software, 

e.g. luminaire configurations. The PC configuration soft-

ware is available optionally.

6    First commissioning and modifying  

network settings

The network settings of the Web-Controller can be modi-

fied by the PC software or via web browser. The 

following procedure describes the setup via web browser.

 NOTE 

For correct perform of the duration test and function test 
the date and the time must be adjusted (see chapter 6.5).

6.1   Factory default nework settings

The  Web-Controller is supplied as standard with 

the fixed IP address 192.168.1.200. Operation via DHCP 

(dynamic IP address assignment) is possible but not 

factory-activated.
Because typical company networks only permit own-

assigned IP addresses, we recommend configuring 

network settings via direct connection to a PC, e.g. a 

notebook.

6.2   Preparing the PC for configuration

It is mandatory to observe the following:

O

O

For direct connection from the  Web-Controller 

to a PC, a crossover cable is required.

O

O

The devices must be in the same subnet, meaning the 

network card of the PC must be set to 192.168.1.xxx 

(not equal to 200), e.g. 192.168.1.50 (subnet to 

255.255.255.0).

O

O

Settings for gateway and DNS must not be taken into 

account with a direct connection.

Connection example for direct connection: 

patch cable

230V/AC

Содержание CGLine+ Web Controller

Страница 1: ...Installation and Operating Instructions CGLine Web Controller Target group Electrical specialists CGLine Web Controller...

Страница 2: ...EENS 13 7 1 Home start screen 13 7 2 Start screen after registration 14 7 3 Overview of all faulty luminaires complete overview 15 7 4 Overview of all faulty luminaires for each zone 16 7 5 Overview o...

Страница 3: ...each or 2 lines with max 400 luminaires each only with homogeneous installation of CGLine luminaires CGVision software Configuration and full visualisa tion of 32 x 800 luminaires Alternative Network...

Страница 4: ...s policies O O Restrict Network Access Ideally CGLine Web Controller should be installed on a segregated net work However when the CGLine Web Controller is connected to a wider network make sure that...

Страница 5: ...hnical regulations when set ting up and operating electrical operating equipment 5 1 Assembly Observe impermissible temperatures at the installation location during mounting The permissible ambient te...

Страница 6: ...tional method O O Press the service pin 1 sec but 3 sec function test started for all luminaires O O Press the service pin 6 sec only new luminaires search started 1 6 7 8 9 10 2 3 4 5 3 Push buttons...

Страница 7: ...Cable length line Cross section Length Total lines 0 5 qmm 260 m 660 m 1 0 qmm 520 m 1320 m 1 5 qmm 800 m 2000 m Table 4 Electrical data line Power supply bus 25 V Max permissible voltage drop 6 V Bus...

Страница 8: ...ction enables connection of the CGLine Web Controller to a standard PC Controller functions can be programmed via the PC and a configuration software e g luminaire configurations The PC configuration...

Страница 9: ...llowing screen is displayed 1 2 The following screen is displayed Mark the entry Internet protocol version 4 1 then con tinue with Properties 2 Usually the network card is on DHCP i e Automatically re...

Страница 10: ...to the address bar The start screen of the CGLine Web Controller opens The screen shows an overview of the installed CGLine system with sum status information To have access to the submenus a login 1...

Страница 11: ...ar In the submenu configura tion 1 It is possible to change the network set tings 1 6 5 Modifying of the language date and time To change the language to English please click on Configuration 1 in the...

Страница 12: ...via the names is pos sible The CGLine Web Controller is supplied with a factory set static IP address of 192 168 1 200 3 Operation via DHCP is possible but in this case it is recommended to select st...

Страница 13: ...Password GUEST 1 The Admin Account allows full access to the CGLine Web Controller e g start function test The User account allows only access for monitoring the status of the controller and connecte...

Страница 14: ...Yellow min 1 lumi naire faulty O O Red min 3 luminaires faulty e g lamp failure After the login the navigation menu appears on the left side 1 O O Home The start screen is accessed via Home at any tim...

Страница 15: ...le to enter to the building layout picture if it is prepared The menu Oveview 1 and the tab Overview luminaire failure 2 display all lumi naires with a fault 3 O O L line no 1 4 O O Z zone 2 16 O O B...

Страница 16: ...r 40071860236 E February 2019 www eaton com 7 4 Overview of all faulty luminaires for each zone All luminaires with a fault in a zone are displayed in the Overview menu 1 and the Zone tab 2 Via the dr...

Страница 17: ...erview luminaires 2 shows all installed luminaires on the CGLine Web Controller 1 2 7 6 Information information text of the luminaires This screen shows the name with max 20 char acters and informatio...

Страница 18: ...of luminaires addresses For changing the configuration of luminaires addresses please follow the steps below 1 Click on the tab Luminaires The table with all the lumi naires installed appears 2 Click...

Страница 19: ...uration tests are aborted O O Switch maintained mode ON OFF Luminaires in maintained mode L applied can be switched ON or OFF if luminaire supports this function O O Update luminaire status Actualisia...

Страница 20: ...s On the Test tab 2 in the configuration menu 1 it is possible to deter mine start times for a function test and duration test for up to 8 groups It is also possible to set a test interval via which t...

Страница 21: ...d mode luminaires of the line as long as the input is active O O Start function test With positive pulse starts the function test with all luminaires O O Stop FT DT Interrupts a duration test or funct...

Страница 22: ...necessary after the commissioning to correctly set the date and time in the CGLine Web Controller here 5 2 1 4 5 3 7 13 Network settings Follwing settings are possible O O DHCP Dynamic Host Control Pr...

Страница 23: ...plete logbook is downloadable via log book dat This file is only usable with the CGLine PC software see manual CGLine PC software The CGLine Web Controller contains an integrated e mail client 1 that...

Страница 24: ...n layouts of the building or areas It is pos sible to import up to 30 building layout plans with max 200 luminaires each The colour of the luminaire shows the status e g red luminaire failure To use t...

Страница 25: ...ing layouts can displayed now by the folder List of building layouts 1 With click on the name of the layout which is displayed as hyperlink with xml exten sion 2 the layout can load from the controlle...

Страница 26: ...n there is a search function 1 2 This enables quickly finding any defective luminaires in a building To find a luminaire in the layout plan the line the zone and the luminaire to address can be select...

Страница 27: ...entered here After confirming via Add the devices are automati cally created A device can be deleted from the list again via Delete 3 3 1 2 7 24 Overview all Web Controller With several installed CGLi...

Страница 28: ...ht solution for the application But decision makers demand more than just innovative pro ducts They turn to Eaton for an unwavering commitment to personal support that makes customer success a top pri...

Отзывы: