INSTALLATION
Eaton BladeUPS Bar Installation Guide
S
164201723 Rev 2
www.eaton.com/powerquality
11
14.
Secure the terminal block assembly bracket to the rack with three
M6
12 hex bolts. Install the bolts from the
rear
of the rack.
Use a large screwdriver or crowbar to lift the bar in place to align
the holes in the terminal block assembly bracket with the holes in
the rack.
Install the lowest bolt in position 2, then use positions 8 and 14.
Verify that the terminal block assembly bracket stud aligns
completely with the rack hole between the lower and middle bolts
(position 5). See Figure 6. Torque the bolts to 5.1
±
0.8 Nm
(45
±
7 lb in).
Содержание BladeUPS none
Страница 1: ...Powerware Series Eaton BladeUPS Bar Installation Guide ...
Страница 30: ...INSTALLATION Eaton BladeUPS Bar Installation Guide S 164201723 Rev 2 www eaton com powerquality 26 ...
Страница 32: ...SPECIFICATIONS Eaton BladeUPS Bar Installation Guide S 164201723 Rev 2 www eaton com powerquality 28 ...