INSTALLATION
Eaton BladeUPS Bar Installation Guide
S
164201723 Rev 2
www.eaton.com/powerquality
18
5.
Loosen the three adjustment screws on each side of the wireway
housing and adjust the side brackets for the depth of the rack. Do
not retighten the screws.
6.
Install six M6
12 pan-head screws and M6 split lock washers to
secure the two wireway side brackets to the front of the rack.
Install the first screws in the sixth hole location from the top.
Torque the screws to 5.1
±
0.8 Nm (45
±
7 lb in).
7.
Tighten the three M6 hex nuts installed in Step 4. Torque the nuts
to 5.1
±
0.8 Nm (45
±
7 lb in).
8.
Retighten the six side bracket adjustment screws loosened in
Step 5. Torque to 3.4 Nm (30 lb in).
Rear of Rack
Front of Rack
M6 Hex Nuts on
Wireway Studs
(3 places)
Side Bracket
Adjustment Screws
(3 places each side)
Adjustable Side
Brackets
(1 each side)
M6
12 Pan-Head
Screws and M6 Split
Lock Washers
(3 places each side)
Figure 13. Wireway Installation
9.
Place the ferrite assembly on the floor of the wireway and secure
with the supplied tie wrap. Loop the tie wrap through both
attachment sites on the wireway floor and through the ferrite
assembly. See Figure 14.
10.
Note the orientation of the terminal block assembly bracket installed
on the bar for later re-installation (see Figure 15). Remove and retain
the terminal block assembly bracket and hardware.
Содержание BladeUPS none
Страница 1: ...Powerware Series Eaton BladeUPS Bar Installation Guide ...
Страница 30: ...INSTALLATION Eaton BladeUPS Bar Installation Guide S 164201723 Rev 2 www eaton com powerquality 26 ...
Страница 32: ...SPECIFICATIONS Eaton BladeUPS Bar Installation Guide S 164201723 Rev 2 www eaton com powerquality 28 ...