INSTALLATION
Eaton BladeUPS Bar Installation Guide
S
164201723 Rev 2
www.eaton.com/powerquality
20
12.
Secure the bar to the wireway with three M6
12 hex bolts. Install
the bolts from the
front
of the rack. See Figure 15. Torque the bolts
to 5.1
±
0.8 Nm (45
±
7 lb in).
13.
Reinstall the terminal block assembly bracket removed in Step 10.
Install the bolts from the
front
of the rack. See Figure 15. Torque the
bolts to 5.1
±
0.8 Nm (45
±
7 lb in).
NOTE
Do not change the original orientation of the terminal block assembly bracket. Verify
that the threaded holes mount to the rack, not to the bar.
Rear of Rack
Front of Rack
Terminal Block
Assembly Bracket
M6
12 Hex Bolts
(3 places)
Figure 15. Terminal Block Assembly Installation
14.
Secure the terminal block assembly bracket to the rack with three
M6
12 hex bolts. Install the bolts from the
rear
of the rack.
Use a large screwdriver or crowbar to lift the bar in place to align
the holes in the terminal block assembly bracket with the holes in
the rack.
Install the highest bolt in position 5 from the top, then use positions
11 and 17. Verify that the terminal block assembly bracket stud
aligns completely with the rack hole between the lower and middle
bolts (position 14). See Figure 16. Torque the bolts to 5.1
±
0.8 Nm
(45
±
7 lb in).
Содержание BladeUPS none
Страница 1: ...Powerware Series Eaton BladeUPS Bar Installation Guide ...
Страница 30: ...INSTALLATION Eaton BladeUPS Bar Installation Guide S 164201723 Rev 2 www eaton com powerquality 26 ...
Страница 32: ...SPECIFICATIONS Eaton BladeUPS Bar Installation Guide S 164201723 Rev 2 www eaton com powerquality 28 ...