INSTALLATION
Eaton BladeUPS Bar Installation Guide
S
164201723 Rev 2
www.eaton.com/powerquality
15
22.
Using four M5
16 hex bolts and four M5 cage nuts, secure the
front cover mounting panel to the front of the rack. Ensure that the
bent edge of the panel is at the top. See Figure 10.
Install the lower bolts and cage nuts into the second holes from the
bottom of the rack frame. Torque the bolts to 5.1
±
0.8 Nm
(45
±
7 lb in).
M5
16 Hex Bolts
and M5 Cage Nuts
(4 places)
Front Cover
Mounting Panel
Front of Rack
Bent Edge of Panel
Figure 10. Front Cover Mounting Panel Installation
Содержание BladeUPS none
Страница 1: ...Powerware Series Eaton BladeUPS Bar Installation Guide ...
Страница 30: ...INSTALLATION Eaton BladeUPS Bar Installation Guide S 164201723 Rev 2 www eaton com powerquality 26 ...
Страница 32: ...SPECIFICATIONS Eaton BladeUPS Bar Installation Guide S 164201723 Rev 2 www eaton com powerquality 28 ...