82
30-200 kW
P-164000249
User's and Installation Guide
Revision 2
10 Installation checklist
All packing materials and restraints have been removed from each cabinet.
Each cabinet in the UPS system is placed in its installed location.
A cabinet grounding/mounting kit is installed between any cabinets that are bolted to-
gether.
All conduits and cables are properly routed to the UPS and any ancillary cabinets.
All power cables are properly sized and terminated.
Neutral conductors are installed or bonded to ground as per requirements.
A ground conductor is properly installed.
Battery cables are terminated and connected to battery connectors.
Battery Shunt trip and Aux contact signal wiring is connected from the UPS to the bat-
tery breaker.
LAN and telephone drops are installed.
All telephone and LAN connections have been completed.
Air conditioning equipment is installed and operating correctly.
The area around the installed UPS system is clean and dust-free. (It is recommended
that the UPS be installed on a level floor suitable for computer or electronic equipment.)
Adequate workspace exists around the UPS and other cabinets.
Adequate lighting is provided around all UPS equipment.
A 230 VAC service outlet is located within 7.5 meters of the UPS equipment.
The Remote Emergency Power-off (REPO) device is mounted in its installed location
and its wiring is terminated inside the UPS cabinet.
Содержание 93PM IBC-L
Страница 1: ...Eaton 93PM UPS P 164000249 30 200 kW User s and Installation Guide...
Страница 2: ......
Страница 3: ...Eaton 93PM UPS 30 200 kW User s and Installation Guide...
Страница 19: ...P 164000249 30 200 kW 11 Revision 2 User s and Installation Guide Figure 2 2 93PM 50 kW UPS wiring diagram...
Страница 50: ...42 30 200 kW P 164000249 User s and Installation Guide Revision 2 Figure 4 5 93PM battery cabinet EBC S...
Страница 51: ...P 164000249 30 200 kW 43 Revision 2 User s and Installation Guide Figure 4 6 93PM battery cabinet EBC L...