Eaton 93PM Integrated Accessory Cabinet-Tie (50 kW and 100 kW IAC-T) Installation and Operation Manual P-164000371—Rev 05
Figure 11. Top and Bottom Conduit Landing Wire Entry Location
Front
Top View
Top Access Conduit Entry
Landing Plates for AC Input
and Outputt
(Remove panel to drill or
punch conduit holes.)
Bottom Access Conduit Entry
Landing for AC Input and
Outputt
(Remove panel to drill or
punch conduit holes.)
Front
Bottom View
9.
Bottom Entry Wiring.
Remove the bottom conduit plate (see
) from the inside bottom of the
IAC-T. Identify all conduit requirements (both input and output) and mark their location. Drill and punch all
conduit holes in the bottom conduit plate prior to mounting on the IAC-T. Install the conduit plate and
install all conduit runs into the plate. Pull the wiring through conduit into the wiring area.
10. Route the IAC-T MOB input cables (phase A, B, and C and Ground) from the UPS cabinets through the
bottom of the IAC-T to the IAC-T MOB input terminals. See
for IAC-T wiring access information
and
for IAC-T terminal locations. See paragraph
IAC-T Power Wiring Preparation
,
, or
for IAC-T wiring and termination requirements. Refer to the applicable Eaton 93PM UPS
Installation and Operation manual, listed in paragraph
, for the UPS terminal
locations and termination requirements.
11. Route the output cables (phase A, B, and C and Ground) from the IAC-T through the bottom of the cabinet
to the critical load. See
for IAC-T terminal locations. See paragraph
IAC-T Power Wiring Preparation
,
,
, or
for IAC-T wiring and termination
requirements. Refer to the
Eaton 93PM Integrated Accessory Cabinet-Distribution (50 kW, 100 kW, 150
kW, and 200 kW IAC-D) Installation and Operation Manual
, listed in paragraph
,
for IAC-D conduit and terminal locations and termination requirements.
12. Proceed to
.
13.
Top Entry Wiring.
Remove the top conduit plate (see
) from the top of the IAC-T. Identify all
conduit requirements (both input and output) and mark their location. Drill and punch all conduit holes in
the top conduit plate prior to mounting on the IAC-T. Install the conduit plate and install all conduit runs into
the plate. Pull the wiring through the conduit into the wiring area.
14. Route the IAC-T MOB input cables (phase A, B, and C and Ground) from the UPS cabinets through the top
of the IAC-T to the IAC-T MOB input terminals. See
for IAC-T wiring access information and
for IAC-T terminal locations. See paragraph
IAC-T Power Wiring Preparation
,
, or
for IAC-T wiring and termination requirements. Refer to the applicable Eaton 93PM UPS
Installation and Operation manual, listed in paragraph
, for the UPS terminal
locations and termination requirements.
15. Route the output cables (phase A, B, and C and Ground) from the IAC-T through the top of the cabinet to
the critical load. See
for IAC-T terminal locations. See paragraph