Eaton 93PM Integrated Accessory Cabinet-Tie (50 kW and 100 kW IAC-T) Installation and Operation Manual P-164000371—Rev 05
81
MOB 3 (if installed)
CLOSED
MOB 4 (if installed)
CLOSED
3.
Start the UPS. Refer to the applicable Eaton 93PM UPS Installation and Operation manual, listed in
paragraph
, for multiple UPS parallel operating procedures.
4.
Close the door and secure the latch.
66..33
U
Ussiinngg tthhee U
UP
PS
S w
whheenn aann IIA
AC
C--TT iiss IInnssttaalllleedd ((w
wiitthh aa M
MIIS
S))
To operate the IAC-T:
1.
Open the front door by lifting the latch from the bottom, turning to the right (counterclockwise), and
swinging the door open.
2.
Verify that the IAC-T circuit breakers are set as follows (see
for breaker locations):
MOB 1
CLOSED
MOB 2
CLOSED
MOB 3 (if installed)
CLOSED
MOB 4 (if installed)
CLOSED
MIS
CLOSED
3.
Start the UPS. Refer to the applicable Eaton 93PM UPS Installation and Operation manual, listed in
paragraph
, for multiple UPS parallel operating procedures.
4.
Close the door and secure the latch.
66..44
U
Ussiinngg tthhee U
UP
PS
S w
whheenn aann IIA
AC
C--TT iiss IInnssttaalllleedd ((w
wiitthh aa M
MIIS
S aanndd aa M
MB
BP
P))
To operate the IAC-T:
1.
Open the front door by lifting the latch from the bottom, turning to the right (counterclockwise), and
swinging the door open.
2.
Verify that the IAC-T circuit breakers are set as follows (see
for breaker locations):
MOB 1
CLOSED
MOB 2
CLOSED
MOB 3 (if installed)
CLOSED
MOB 4 (if installed)
CLOSED
MBP
OPEN
MIS
CLOSED
3.
Start the UPS. Refer to the applicable Eaton 93PM UPS Installation and Operation manual, listed in
paragraph
, for multiple UPS parallel operating procedures.
4.
Close the door and secure the latch.
Содержание 93PM IAC-T Series
Страница 98: ...P 16400037105 P 164000371 05 ...