Figure 15. Attaching the ramp to the pallet
1
UPS cabinet
3
Ramp
2
Pallet
11. If the leveling feet are not fully retracted, turn them until they are
retracted.
12. Remove the four bolts securing the rear shipping bracket to the cabinet
and four bolts securing the bracket to the pallet.
13. Remove the rear shipping bracket.
If installing the cabinet permanently, retain the shipping bracket and
securing hardware for later use. Otherwise, recycle the pallet, ramp, and
shipping brackets in a responsible manner.
Eaton 93E Generation 2 UPS 100-200 kVA
(380/400/415V)
User's and installation guide
©
Eaton Corporation plc 2019. All rights reserved.
Revision: 002
Document ID: P-164000848
52 (118)