Figure 20. Power terminal detail 160-200 kVA
1
AC input to UPS rectifier, Phase A (L1)
8
Earth/Ground
2
AC input to UPS rectifier, Phase B (L2)
9
DC input from external b
3
AC input to UPS rectifier, Phase C (L3)
10
DC input from external battery -
4
AC input to UPS bypass, Phase C (L3)
11
Neutral (N)
5
AC input to UPS bypass, Phase B (L2)
12
AC output to critical load, Phase A (L1)
6
AC input to UPS bypass, Phase A (L1)
13
AC output to critical load, Phase B (L2)
7
Earth/Ground
14
AC output to critical load, Phase C (L3)
When you have finished the cable routing, use fireproof mud to block the space
between the cable and cabinet.