Eaton 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual
S
164201710 Rev 2
www.eaton.com\powerquality
7-1
Chapter 7
UPS Operating Instructions
This section describes how to operate the UPS.
NOTE
Before starting the UPS, ensure all installation tasks are complete and a preliminary startup has
been performed by authorized service personnel. The preliminary startup verifies all electrical
interconnections to ensure the installation was successful and the system operates properly.
NOTE
Read this section of the manual and have thorough knowledge of UPS operation before attempting
to operate any of the controls.
NOTE
The UPS displays 2 minutes of battery runtime at the initial startup. After a 24-hour charging period,
the UPS automatically runs a battery test and the correct battery runtime displays.
7.1
UPS Controls and Indicators
The controls and indicators identified and described in this section are used to control
and monitor UPS operation. Figure 7‐1 shows the controls and indicators.
ISBM
UPM 1
UPM 2
Control Panel
AC Input Breaker CB1
(Optional)
(Not available with
separate rectifier feed
option.)
Figure 7‐1. UPS Controls and Indicators
Figure
Содержание 9395 Plus 1
Страница 1: ...Powerware Series Eaton 9395 Plus 1 UPS 225 275 kVA Installation and Operation Manual ...
Страница 2: ......
Страница 3: ...Powerware Series Eaton 9395 Plus 1 UPS 225 275 kVA Installation and Operation Manual ...
Страница 185: ......
Страница 186: ... 1642017102 164201710 2 ...