10.
If removed, reinstall the safety shield panel removed in paragraph 5.1, Step 5.
Secure with the retained hardware.
11.
If removed, reinstall the left front panel removed in paragraph 5.1, Step 4 and
secure with the retained hardware.
12.
Restart the UPS. See Chapter 7, “UPS Operating Instructions,” for startup
instructions.
NOTE
Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an authorized Eaton
Customer Service Engineer. Contact an Eaton service representative to schedule a date.
13.
Contact an Eaton service representative for verification and testing of the RIM II
and its connections prior to making connections with J1 through J4 (see
Table 5‐6 and Figure 5‐9).
You can order interface cables separately for connecting to the 15‐Pin D‐Sub
Connectors.
Table 5‐6. J1 through J4 Interface Connectors
Status
J1 through J4
Description
UPS AVAILABLE
Pins 1 and 12
Contacts are closed when the UPS is operating in Online mode
or ready to supply the load.
UPS OFFLINE
Pins 3 and 13
Contacts are open when the UPS is offline. Contacts are closed
when the UPS is operating in Online mode.
BATTERY WEAK
Pins 5 and 14
Contacts are closed when approximately two minutes of battery
time remains before the critical load is lost.
UTILITY FAILURE
Pins 6 and 15
Contacts are closed when Utility Failure is detected.
15-Pin D‐Sub
Connectors
Figure 5‐9. J1, J2, J3, and J4 15-Pin D-Sub Connectors
Содержание 9395 Plus 1
Страница 1: ...Powerware Series Eaton 9395 Plus 1 UPS 225 275 kVA Installation and Operation Manual ...
Страница 2: ......
Страница 3: ...Powerware Series Eaton 9395 Plus 1 UPS 225 275 kVA Installation and Operation Manual ...
Страница 185: ......
Страница 186: ... 1642017102 164201710 2 ...