UPS SYSTEM INSTALLATION
Eaton 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual
S
164201710 Rev 2
www.eaton.com\powerquality
4-6
Use the procedures in the following paragraphs to connect the external and battery
power wiring.
4.5.1
2‐Hole Barrel Lug Terminations to Bus Bar Installation
Paragraphs 4.5.2 and 4.5.3 require connecting input, output, and battery power wiring
using 2-hole barrel lugs. See Figure 4‐3 for the hardware sequence when installing the
lugs to the bus bars. Tighten the nut to the torque value listed in Table 3‐7.
NOTE
Conical washers are special purpose washers that look similar to flat washers, except for a slight
conical shape. When installing conical washers, the top of the dome should be next to the nut and the base
of the washer should be against a flat surface such as a bus bar, flat washer, or large terminal.
Hex Nut
Conical Washer
Lug
Bus Bar
Flat Washer
Bolt Head
Lug
Flat Washer
Hex Nut
Conical Washer
Lug
Bus Bar
Flat Washer
Bolt Head
Flat Washer
Single Lug Installation
Double Lug Installation
Figure 4‐3. Typical Bus Bar Barrel Lug Mounting – Hardware Assembly Sequence
Содержание 9395 Plus 1
Страница 1: ...Powerware Series Eaton 9395 Plus 1 UPS 225 275 kVA Installation and Operation Manual ...
Страница 2: ......
Страница 3: ...Powerware Series Eaton 9395 Plus 1 UPS 225 275 kVA Installation and Operation Manual ...
Страница 185: ......
Страница 186: ... 1642017102 164201710 2 ...