易仕韦尔
EASYWELL
第
5
页
6KG
L≤15m
12KG
L≤20m
9KG
L≤15m
18KG
L≤20m
Fig 8 and Fig 9 are the installation diagram
Fig 8
Fig 9
Tips:
in the place where there is no need to install pipes, try not to fog along the front
of the machine (the direction of the control panel), fog to the left, right or behind of
the machine. Please ensure each outlet of the fog with a length of no less than 1 meter
pipe extension(you can also increase a 45℃ elbow). Under the condition of no
pipeline, it is not allowed to be used for a long time, otherwise the equipment will be
easily damaged by the dripping of fog droplets and the short cycle of moisture will
lead to the failure of components. The worst result is cause accidents. It is
recommended that the equipment be separated from the humidifying room where the
humidity is higher than 85%RH.
5. Atomizing system
The indicator light is green when powered up
,
and is red when working. The
indicator light is green when the water is not enough or water lever is not reached.
Requirements for water quality: when the water temperature of the tank is
≥45℃,the atomizer is forced to start protection, not to run; when there is oily or
sticky substances in the water, the atomizer does not work or fog; when the water