8
1): Cutting a groove in the floor for PVC
pipes.
To keep the floor height as low as possible,
you can cut out a groove of approximately
1 cm deep in the places where the PVC pipes
for the floor sensor and the connection cable
have to be laid.
2): Priming the subfloor
The cement subfloor needs to be primed
with a suitable primer so it will bond
properly with the screed. This primer also
helps prevent the forming of air bubbles and
water being extracted too quickly when
levelling with the self-levelling floor screed.
Follow the manufacturer’s instructions.
3): Placing the mounting strip
The Easy Heat mounting strips should be laid
in grooves cut into the subfloor. The distance
between the strips and the wall should be
20 cm. The distance between the mounting
strips is 40 to 50 cm. Nail or screw the strip
into position. The sides should be kept free
with the lipping insulation.
Содержание Warm Tiles
Страница 1: ...Installatiehandleiding Installation manual NL GB P 3 P 7...
Страница 13: ...11 Aantekeningen Notes...