![Eastey ET2008 Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/eastey/et2008/et2008_user-manual_3498039035.webp)
Maintenance 35
Step 3 – Weave the strand to the other side
1. Repeat the steps in Step 2, going in the opposite direction, weaving to the other
side edge of the belt as shown in the following illustrations.
2. If you are installing a new belt, you are finished splicing.
Step 4 – Check Drive Shaft Sprocket Alignment
•
Check to ensure 3/16-inch clearance between all sprockets (and/or blanks) and the
Z-bends next to them.
•
Check alignment of sprocket teeth with a straight-edge. (Only necessary if the
sprockets are not keyed to the drive shaft.)
A
C
E
B
D
1
3
5
2
4
A
E
B
D
C
1
5
2
4
3
A
E
C
B
D
2
4
1
5
3
Содержание ET2008
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 43: ...Parts List 43 Parts List Electrical Eastey Bundling Shrink Tunnel Part No Description...
Страница 44: ...44 Parts List Part No Description...
Страница 45: ...Parts List 45 Mechanical Hood Parts Part No Description...
Страница 46: ...46 Parts List Conveyor Parts Part No Description...
Страница 47: ...Parts List 47 Part No Description...
Страница 48: ...48 Parts List...
Страница 53: ...Appendix A Electrical Schematic 53...
Страница 57: ......