16 Installation
Location Requirements
When installing the shrink tunnel please be aware of the following considerations:
1. The surface on which it is located is flat and level.
2. Conveyor or packing table height.
3. Alignment with packaging line.
When the shrink tunnel is positioned in the operating location you will need access to
the control panel.
Provision should be made for finished exiting packages. For example, a table or bin
where packages that have been sealed will be placed until they can be picked up or
moved out.
Take into consideration the entrance conveyor height in relation adjacent machinery,
such as the sealer feeding into it, for example.
The machine should be placed on a flat, level floor so that it does not rock or move. We
recommend that the leveling feet be used to level the machine.
Set up the shrink tunnel and move it to its location. The casters allow easy movement
over smooth flat surfaces.
CAUTION!
If the shrink tunnel must be lifted for moving, use proper
equipment when lifting and moving it to ensure it is secure
and will not shift.
When the shrink tunnel has been moved to its location, use the leveling legs to level the
conveyor and adjust it to its final height. A power cord to the main electrical disconnect
switch (with optional electrical plug) should be installed by a licensed electrician.
Refer to instructions in the Operation section for instructions to power up or shut down
the machine.
Содержание ET2008
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 43: ...Parts List 43 Parts List Electrical Eastey Bundling Shrink Tunnel Part No Description...
Страница 44: ...44 Parts List Part No Description...
Страница 45: ...Parts List 45 Mechanical Hood Parts Part No Description...
Страница 46: ...46 Parts List Conveyor Parts Part No Description...
Страница 47: ...Parts List 47 Part No Description...
Страница 48: ...48 Parts List...
Страница 53: ...Appendix A Electrical Schematic 53...
Страница 57: ......