![Eastey ET2008 Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/eastey/et2008/et2008_user-manual_3498039034.webp)
34 Maintenance
Step 2 – Weave the strand to one side
1. Bend one end of the wire up and insert it around the z-bend in the next space on the
edge of the wire closest to you. (Space 5 in the following illustration.) Always try to
avoid bending the wire in the z-bend.
2. Bend the wire toward the center and insert it around the z-bend next to the center
space. (Space D in the following illustration.)
3. Pull the strand wire through the mesh and straighten it with pliers.
4. Repeat the above three moves until you reach the side edge of the belt.
5. Using the pliers, connect the strand’s edge loop to the belt’s edge loop on the far
edge.
6. Connect the edge loop on the near edge of the belt to the strand’s edge loop.
7. Straighten the strand with the pliers.
A
E
C
B
D
1
5
3
2
4
Far Edge
Near Edge
A
C
E
B
D
1
3
5
2
4
Содержание ET2008
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 43: ...Parts List 43 Parts List Electrical Eastey Bundling Shrink Tunnel Part No Description...
Страница 44: ...44 Parts List Part No Description...
Страница 45: ...Parts List 45 Mechanical Hood Parts Part No Description...
Страница 46: ...46 Parts List Conveyor Parts Part No Description...
Страница 47: ...Parts List 47 Part No Description...
Страница 48: ...48 Parts List...
Страница 53: ...Appendix A Electrical Schematic 53...
Страница 57: ......