Maintenance 29
and replace the motor. Rotation on the blower motor needs to be counter-clockwise as
viewed from the electrical inlet and hub side. Reassemble the new motor and blower
wheel housing and reassemble components in the same manner in which they were
disassembled.
Note:
Do not rest blower housing on blower wheel! Blower wheel will not work if bent or
out of balance.
Blower wheel replacement
Shut off power to the machine. Refer to
Blower motor replacement
instructions above.
Placement of upper wear rails
Shut off power to the machine, move the conveyor by hand if necessary to gain access.
Remove the #10-32 screw on the idler end. Replace parts in the same manner in which
they were disassembled.
Chamber cooling fan motor replacement
Shut off power to the machine. Remove the top lid of the hood. Disconnect the wires.
Remove four (4) ¼-20 screws which hold the cooling fan motor in place. Take the motor
out of the machine, replace with the new motor, and reassemble with four (4) ¼-20
screws removed earlier. Reconnect wires to new motor and
Plastic Belt Assembly and Disassembly
Caution!
Disconnect main power to the conveyor before attempting to
remove or assemble belt.
When repairing or replacing the belt, it is important to orient the belt correctly.
•
The top side of the belt is relatively smooth and the ribs are recessed.
•
The bottom side of the belt has metal disks visible and the ribs are flush.
Top
view
Содержание ET2008
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 43: ...Parts List 43 Parts List Electrical Eastey Bundling Shrink Tunnel Part No Description...
Страница 44: ...44 Parts List Part No Description...
Страница 45: ...Parts List 45 Mechanical Hood Parts Part No Description...
Страница 46: ...46 Parts List Conveyor Parts Part No Description...
Страница 47: ...Parts List 47 Part No Description...
Страница 48: ...48 Parts List...
Страница 53: ...Appendix A Electrical Schematic 53...
Страница 57: ......