
52 Maintenance
Replacement of Upper Wear Rails
Shut off power to the machine, move the conveyor by hand if necessary to gain access.
Remove the #10-32 screw on the idler end. Replace parts in the same manner in which
they were disassembled.
Chamber Cooling Fan Motor Replacement
Shut off power to the machine. Remove the top lid of the hood. Disconnect the wires.
Remove four (4) ¼-20 screws which hold the cooling fan motor in place. Take the motor
out of the machine, replace with the new motor, and reassemble with four (4) ¼-20
screws removed earlier. Reconnect wires to new cooling fan motor.
Содержание Combination EC Series
Страница 1: ...EC Combination Series Semi Automatic L Sealer Tunnel User Guide EC2016T EC2016TK EC2028T EC2028TK ...
Страница 2: ......
Страница 4: ......
Страница 73: ...Appendix A Electrical Schematic 73 Electrical Schematic L Sealer ...
Страница 81: ......