Operation 19
Shrink Tunnel Control Panel
Controls for shrink tunnel operation are located on the upper enclosure above the
entrance to the shrink tunnel
1.
Power On-Off Switch
— The power on/off switch located at the top of the electrical
panel turns the power off or on for the Shrink Tunnel.
Toggling the lever to the On position turns the heater, conveyor, and system
power on.
Toggling the lever to the Off position turns the heater, conveyor, and system
power off.
2.
Conveyor Speed
— Speed setting dial control for controlling speed of the shrink
tunnel conveyor.
3.
Heater On-Off Switch
— Toggle switch for turning the heater bank on or off.
4.
Blower Speed Control
— Speed setting dial control for blower speed.
NOTE:
The blower motor speed setting dial control is located off the
panel door to the left of the rest of the controls above the
shrink tunnel entrance.
5.
Temperature Controller
— Temperature setting and current temperature inside the
chamber is displayed.
CAUTION!
When the power is turned on be aware of heat inside of the
tunnel chamber and hot surfaces and moving belts or rollers.
0
10
20
30
40
50
60
70
80
90
100
0
10
20
30
40
50
60
70
80
90
100
PV
SV
TZ4L
TEMPERATURE CONTROLLER
SV2
AT
OUT
EV1
EV2
POWER ON
ENCHUFE EN
OFF
APARADO
HEATER BANK
BANCO de CALENTADORA
CONVEYOR SPEED
VELOCIDAD de TRANSPORTADOR
TURN OFF FOR
COOLDOWN
APAGUE PARA
el PLUMON FRESCO
1
2
3
5
4
AIRFLOW CONTRO L
0
10
20
30
40
50
60
70
80
90
100
Содержание Combination EC Series
Страница 1: ...EC Combination Series Semi Automatic L Sealer Tunnel User Guide EC2016T EC2016TK EC2028T EC2028TK ...
Страница 2: ......
Страница 4: ......
Страница 73: ...Appendix A Electrical Schematic 73 Electrical Schematic L Sealer ...
Страница 81: ......