Installation, Operation and Parts Manual
EE-6604BWF
-
23
S/N
Components
Methods
Period
8
Padding plate for the start roller
Check its
tightness and
add grease.
Every 1 month
9
Terminals in the control unit
Open the control unit, inspect the wire terminals and
screw firmly if any terminals become loose.
Every 3 months
10
Joint shafts
Add grease into the oil cups.
Every 3 months
11
Anchored expansion bolts
Check with torque spanner.
Screw torque:80Nm
Every 3 months
12
Circlip on the shaft
Check and ensure it is in the slot of the shaft.
Every 3 months
13
Sliding blocks
Add grease onto the tracks for sliding blocks
Every 3 months
14
Self-locking nut
Check with torque spanner. The torque should be no less
than 330N.m.
Every 3 months
15
Fixation holder of the wheel free
jack
Check with torque spanner. The torque should be no less
than 55N.m.
Every 3 months
16
Lifting platform synchronization
Check the synchronization of both lifting platforms. Ensure
both platforms ascend and descend synchronously.
Every day
17
Hydraulic oil
Change the oil 6 months after initial use and once per year
thereafter. Inspect the hydraulic oil and change the oil if
the oil becomes black or there is dirt in the oil tank.
Every year
18
Whole Lift
Running the lift for several cycles with and without rated
load. The lift can run steadily and smoothly with no
abnormal noise. Check the synchronization of both lifting
platforms. Ensure both platforms ascend and descend
synchronously.
Every 3 months
If users stick to the above maintenance requirements, the lift will always keep a good working condition
and its service life could be extended.
Содержание EE-6604BWF
Страница 10: ...Installation Operation and Parts Manual EE 6604BWF 10 3 3 Dimensions...
Страница 26: ...Installation Operation and Parts Manual EE 6604BWF 26 Annex 2 Electrical schemes and parts list...
Страница 27: ...Installation Operation and Parts Manual EE 6604BWF 27...
Страница 28: ...Installation Operation and Parts Manual EE 6604BWF 28...