Installation, Operation and Parts Manual
EE-612E
13
S/N
Name
Spec.
Qty
Note
26
Portable
kit
connection
assembly
612E
‐
A2
‐
B2
1
27
Sleeve
612E
‐
A10
1
28
Connection
shaft
612E
‐
A9
1
29
Clip
M16
2
4.2
Installation
attentions
4.2.1
Joints
of
oil
hose
and
wiring
must
be
firmly
connected
in
order
to
avoid
leakage
of
oil
hose
and
looseness
of
electrical
wires.
4.2.2
All
bolts
should
be
firmly
screwed
up.
4.2.3
Do
not
place
any
vehicle
on
the
lift
in
the
case
of
trial
running.
4.3
General
Installation
Steps
Step
1:
Remove
the
packaging,
take
out
the
carton
for
accessories.
Step
2:
Place
the
base
frame
on
the
expected
installation
position.
Step
3:
Move
the
lifting
arms
and
control
box
out
from
the
post.
Suspend
the
post
by
lifting
equipment
and
then
dismantle
the
post
from
its
packing
frame
Attention
:
Please
pay
special
attention
not
to
let
the
post
fall
down
for
it
may
cause
casualty
or
bring
damages
to
the
accessories
fixed
in
the
post.
Содержание EE-612E
Страница 16: ...Installation Operation and Parts Manual EE 612E 16 2 Connect lifting arms and the lifting platform...
Страница 19: ...Installation Operation and Parts Manual EE 612E 19 2 Fix electromagnets 3 Fix limit switches...
Страница 28: ...Installation Operation and Parts Manual EE 612E 28...
Страница 30: ...Installation Operation and Parts Manual EE 612E 30 Annex2 Wiring schemes and parts list Single phase...
Страница 31: ...Installation Operation and Parts Manual EE 612E 31 Three phase...
Страница 32: ...Installation Operation and Parts Manual EE 612E 32...
Страница 33: ...Installation Operation and Parts Manual EE 612E 33...
Страница 34: ...Installation Operation and Parts Manual EE 612E 34...