Installation, Operation and Parts Manual
EE-612E
21
Step
11:
Fill
with
hydraulic
oil.
The
volume
of
oil
tank
is
8L.To
insure
the
lift
work
normally,
the
amount
of
oil
in
it
should
reach
4/5
of
the
tank’s
total
volume.
32#anti
‐
abrasion
hydraulic
oil
for
winter,
46#
for
summer.
Step
12:
Trial
running.
1.
Do
refer
to
the
operation
instructions
in
advance
and
keep
in
mind
that
no
vehicle
left
on
the
lift
in
the
process
of
trial
running.
2.
Check
if
all
the
connections
are
in
good
condition.
4.4
Items
to
be
checked
after
installation.
S/N
Check
items
YES
NO
1
Rising
speed
≥
20mm/s;
2
Noise
with
rated
load
≤
75db;
3
Grounding
resistance:
not
bigger
than
4
Ω
;
4
If
the
control
button
works
as
“hold
to
run”?
5
If
limit
switches
work
well?
6
If
grounding
wire
is
connected?
7
If
rising
and
lowering
smoothly?
8
If
there
is
no
abnormal
notice
during
running
with
rated
load?
9
If
there
is
no
oil
leakage
when
running
with
rated
load?
10
If
expansion
bolts,
nuts
or
circlips
is
well
secured?
11
If
max
lifting
height
is
1870mm?
12
If
Safety
advices,
name
plate
and
logos
are
clear?
Содержание EE-612E
Страница 16: ...Installation Operation and Parts Manual EE 612E 16 2 Connect lifting arms and the lifting platform...
Страница 19: ...Installation Operation and Parts Manual EE 612E 19 2 Fix electromagnets 3 Fix limit switches...
Страница 28: ...Installation Operation and Parts Manual EE 612E 28...
Страница 30: ...Installation Operation and Parts Manual EE 612E 30 Annex2 Wiring schemes and parts list Single phase...
Страница 31: ...Installation Operation and Parts Manual EE 612E 31 Three phase...
Страница 32: ...Installation Operation and Parts Manual EE 612E 32...
Страница 33: ...Installation Operation and Parts Manual EE 612E 33...
Страница 34: ...Installation Operation and Parts Manual EE 612E 34...