
Installation, Operation and Parts Manual
EE-612E
22
Turn on the power switch
Press UP button
Motor drives the gear pump work
Cylinder piston drives the chain work
Chain drives the carriage rise
The lift is raised
Start
Start
Turn on the power switch
Press the DOWN button
The lift is lowered
OPERATION
INSTRUCTIONS
5.1
Precautions
5.1.1
Check
all
connections
of
oil
hose.
Only
when
there
is
no
leakage,
the
lift
can
start
work.
5.1.2
The
lift,
if
its
safety
device
malfunctions,
shall
not
be
used.
5.1.3
It
shall
not
lift
or
lower
an
automobile
if
its
center
of
gravity
is
not
positioned
midw
ay
of
the
runways.
Otherwise,
we
as
well
as
our
dealers
will
not
bear
any
responsibility
for
any
consequence
resulted
thereby.
5.1.4
Operators
and
other
personnel
concerned
should
stand
in
a
safety
area
during
lifting
and
lowering
process.
5.1.5
When
runways
being
raised
to
the
desired
height,
switch
off
the
power
at
once
to
lock
the
button
with
a
padlock
to
prevent
any
wrong
operation
done
by
unconcerned
people.
5.1.6
Make
sure
the
safety
lock
of
the
lift
is
engaged
before
start
working
under
the
vehicle
and
no
people
under
the
vehicle
during
lifting
and
lowering
process.
5.2
Flow
chart
for
operation
Raising
Lowering
Содержание EE-612E
Страница 16: ...Installation Operation and Parts Manual EE 612E 16 2 Connect lifting arms and the lifting platform...
Страница 19: ...Installation Operation and Parts Manual EE 612E 19 2 Fix electromagnets 3 Fix limit switches...
Страница 28: ...Installation Operation and Parts Manual EE 612E 28...
Страница 30: ...Installation Operation and Parts Manual EE 612E 30 Annex2 Wiring schemes and parts list Single phase...
Страница 31: ...Installation Operation and Parts Manual EE 612E 31 Three phase...
Страница 32: ...Installation Operation and Parts Manual EE 612E 32...
Страница 33: ...Installation Operation and Parts Manual EE 612E 33...
Страница 34: ...Installation Operation and Parts Manual EE 612E 34...