![Eads CASSIDIAN IDR IDO 3G Скачать руководство пользователя страница 86](http://html1.mh-extra.com/html/eads/cassidian-idr-ido-3g/cassidian-idr-ido-3g_technical-manual_3260847086.webp)
Maintenance
This d
t and its contents are the property of CASSIDIAN
nd must not be copied or circul
7
1
2
3
4
5
4.4
PREVENTIVE MAINTENANCE
4.4.1
Organisation
Preventive maintenance comprises several types of procedure:
• cleaning
• correct functioning check
• preventive replacement of sub-assemblies.
Maintenance and checking procedures are described in P sheets (see Section 4.4.2). The
P sheets themselves are described in Section 4.4.3.
Preventive replacement procedures are described in E sheets (see Section 4.5.3).
All maintenance procedures and their scheduling are listed in Table 4.8.
4.4.2
Schedule of preventive maintenance operations
FREQUENCY
DESCRIPTION OF THE OPERATION
N
°
SHEET
Annually
Visual inspection
1 year and after each
corrective
maintenance
operation
IDR IDO 3G test
Every five years
Checking the synchronisation board pilot (OCXO)
Table 4.8
SCHEDULE OF PREVENTIVE MAINTENANCE OPERATIONS
Содержание CASSIDIAN IDR IDO 3G
Страница 5: ...DEFENDING WORLD SECURITY IDR IDO 3G Technical Manual TMO PS11209BENAB01 07 2012...
Страница 150: ...IDR IDO 3G_MC9_IDR IDO_FAV_PRES_01_01 3 1 2 4 5 7 6 8 9 10 11 15 14 13 12 18 17 16 Plate 6 II IDR IDO 3G FRONT PANEL...
Страница 152: ...1 7 2 3 4 5 IDR IDO 3G_MC9_IDR IDO_3 4 AR OUVERT_PRES_01_01 6 Plate 6 III IDR IDO 3G INTERNAL VIEW...
Страница 154: ...1 2 3 4 5 6 7 8 9 10 11 RIP IDO 3G_MC2_LED_ALIMENTATION_FAV_01_01 Plate 6 IV IDR IDO 3G PRIMARY MAINS OR DC CONVERTERS...
Страница 163: ......
Страница 164: ...MC2 RR APP 00033 02 02 EN...