Maintenance
4-51
7
1
2
3
4
5
REPLACING THE SYNCHRONISATION BOARD
AVAILABILITYE
• No mission capable
OPERATOR(S)
• 1 operator
TIME REQUIRED
• 10 m rollout of Sheet P-3 to check the SYNC reference frequency
(around 30 minutes)
TOOL(S)
• 1 standard tool box
• 1 set of anti-static equipment
• Equipment in Sheet P-3
PRELIMINARY OPERATION(S)
• Install the anti-static equipment (armband, cables, mat).
• Remove the upper cover (see Plate 6.I, item 1).
• Put on the anti-static armband.
SHEET
E-3
Содержание CASSIDIAN IDR IDO 3G
Страница 5: ...DEFENDING WORLD SECURITY IDR IDO 3G Technical Manual TMO PS11209BENAB01 07 2012...
Страница 150: ...IDR IDO 3G_MC9_IDR IDO_FAV_PRES_01_01 3 1 2 4 5 7 6 8 9 10 11 15 14 13 12 18 17 16 Plate 6 II IDR IDO 3G FRONT PANEL...
Страница 152: ...1 7 2 3 4 5 IDR IDO 3G_MC9_IDR IDO_3 4 AR OUVERT_PRES_01_01 6 Plate 6 III IDR IDO 3G INTERNAL VIEW...
Страница 154: ...1 2 3 4 5 6 7 8 9 10 11 RIP IDO 3G_MC2_LED_ALIMENTATION_FAV_01_01 Plate 6 IV IDR IDO 3G PRIMARY MAINS OR DC CONVERTERS...
Страница 163: ......
Страница 164: ...MC2 RR APP 00033 02 02 EN...