![Eads CASSIDIAN IDR IDO 3G Скачать руководство пользователя страница 95](http://html1.mh-extra.com/html/eads/cassidian-idr-ido-3g/cassidian-idr-ido-3g_technical-manual_3260847095.webp)
Maintenance
4-19
7
1
2
3
4
5
CHECKING THE SYNCHRONISATION BOARD PILOT (OCXO)
AVAILABILITY
• No mission capable
FREQUENCY
• Every five years
OPERATOR(S)
• 1 operator
TIME REQUIRED
• 30 minutes
TOOL(S)
• 1 standard tool box
• 1 power meter + power QMA male 50
Ω
adaptor
• 1 electronic c 1 measuring cable fitted with a QMA male 50
Ω
adaptor
PRODUCT(S) / CONSUMABLE(S)
• Not applicable
PRELIMINARY OPERATION(S)
• Check that the electronic counter satisfies all the required characteristics at the time the
measurement is taken (see Section 4.3.4.1)
.
• Remove the upper cover (Plate 6.I, item 1).
SHEET
P-3
Содержание CASSIDIAN IDR IDO 3G
Страница 5: ...DEFENDING WORLD SECURITY IDR IDO 3G Technical Manual TMO PS11209BENAB01 07 2012...
Страница 150: ...IDR IDO 3G_MC9_IDR IDO_FAV_PRES_01_01 3 1 2 4 5 7 6 8 9 10 11 15 14 13 12 18 17 16 Plate 6 II IDR IDO 3G FRONT PANEL...
Страница 152: ...1 7 2 3 4 5 IDR IDO 3G_MC9_IDR IDO_3 4 AR OUVERT_PRES_01_01 6 Plate 6 III IDR IDO 3G INTERNAL VIEW...
Страница 154: ...1 2 3 4 5 6 7 8 9 10 11 RIP IDO 3G_MC2_LED_ALIMENTATION_FAV_01_01 Plate 6 IV IDR IDO 3G PRIMARY MAINS OR DC CONVERTERS...
Страница 163: ......
Страница 164: ...MC2 RR APP 00033 02 02 EN...