Landing Gear Installation
Required Parts
• Airframe
• Landing gear
• Tail skid
• Wheel pant (2)
• Wheel retainer (2)
• 1
1
/
4
" (32mm) wheel (2)
• Landing gear fairing (2)
Required Tools and Adhesives
• Hot glue
• Foam-safe CA
1. Glue the tail skid using foam-safe CA
2. Install the landing gear into position by pressing
up into the landing gear mount.
Note
: Use a small amount of foam-safe CA if
the landing gear is loose in the slot.
32
Содержание Byp Yak
Страница 1: ...Byp Yak Assembly Manual...
Страница 25: ...1 Use hot glue to install the rudder elevator and aileron servos 25...