![Dynojet DynoWare RT 250i Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/dynojet/dynoware-rt-250i/dynoware-rt-250i_installation-manual_2550825009.webp)
1-5
T O R Q U E C E L L I N S T A L L A T I O N
Accessing the Dyno
Version 2
Torque Cell Installation Guide for Model 250i/250iP DynoWare RT Dynammometers
ACCESSING THE DYNO
Installing the load cell requires access to the dyno and eddy current brake. This
section will walk you through accessing both the above ground and in ground dyno.
Make sure you have disconnected the power to the dyno before removing the covers.
Refer to “Main Dyno Power” on page 1-3.
A
CCESSING
THE
D
YNO
—A
BOVE
G
ROUND
You will need to remove the tire carriage, center panel, and eddy current brake top
cover in order to route the load cell cable to the eddy current brake driver.
1
Remove the four screws securing the bearing bracket to the tire carriage and set
aside.
2
Using the hand wheel, or the power carriage, unscrew the bearing bracket and the
carriage screw and set aside.
3
Remove the tire carriage by sliding the carriage under the carriage clamps toward
the back of the dyno and set aside.
Figure 1-3: Remove the Tire Carriage
TC080
hand wheel
carriage screw
screws
carriage clamp
tire carriage
bearing
bracket
nut block