![Dynojet DynoWare RT 250i Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/dynojet/dynoware-rt-250i/dynoware-rt-250i_installation-manual_2550825017.webp)
1-13
T O R Q U E C E L L I N S T A L L A T I O N
Routing the Load Cell Cable
Version 2
Torque Cell Installation Guide for Model 250i/250iP DynoWare RT Dynammometers
R
OUTING
THE
L
OAD
C
ELL
C
ABLE
—I
N
G
ROUND
D
YNO
1
Open the front panel of the CPI to access the eddy current brake driver.
2
Route the load cell cable from the eddy current brake, through the designated
communications pit conduit, and attach to the eddy current brake driver inside
the CPI.
Note:
Be sure to keep the power and communications cables in different pit
conduits.
Figure 1-12: Routing the Load Cell Cable—In Ground Dyno
load cell
route
communications
cables in designated
conduit
DynoWare RT
main module
eddy current
brake driver
control panel
interface (CPI)
air fuel ratio
module (AFR)
load cell cable
P 246
D