C H A P T E R 1
Replacing the Covers
Torque Cell Installation Guide for Model 250i/250iP DynoWare RT Dynammometers
1-14
REPLACING THE COVERS
Before replacing the covers, verify the load cell is installed and the load cell cable is
routed to the eddy current brake driver.
Before replacing the eddy current brake top cover, be sure to calibrate your load cell.
Refer to “Load Cell Calibration” on page 2-2.
R
EPLACING
THE
C
OVERS
—A
BOVE
G
ROUND
D
YNO
1
Secure the center panel to the dyno carriage using the six 1/4-20 x 5/8-inch pan
head screws removed earlier.
2
Secure the nut block and shim using the two 5/16-inch bolts and washers removed
earlier.
3
Secure each carriage clamps and shim using two 5/16-inch bolts and washers
removed earlier,
Figure 1-13: Replace the Center Panel
TC081
screw
center panel
carriage clamp
washer
bolt
shim
nut block
shim