![Dynojet DynoWare RT 250i Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/dynojet/dynoware-rt-250i/dynoware-rt-250i_installation-manual_2550825016.webp)
C H A P T E R 1
Routing the Load Cell Cable
Torque Cell Installation Guide for Model 250i/250iP DynoWare RT Dynammometers
1-12
ROUTING THE LOAD CELL CABLE
Use the following instructions to identify and route the load cell cable.
R
OUTING
THE
L
OAD
C
ELL
C
ABLE
—A
BOVE
G
ROUND
D
YNO
1
Route the load cell cable from the eddy current brake through the air hole in the
drum bulkhead and over to eddy current brake driver.
Make sure the load cell cable is clear of any power cables or hot or rotating objects.
2
Attach the load cell cable to the eddy current brake driver .
3
Secure the load cell cable with a zip tie to the underside of the carriage assembly
bulkhead.
Figure 1-11: Routing the Load Cell Cable—Above Ground Dyno
cable
brief routing description
76950573 load cell and cable—above ground dyno
76950759 load cell and cable—in ground dyno
connects the load cell to the eddy current brake driver
load cell cable
eddy current brake driver
DynoWare RT
load cell
M 158
C
air hole in drum
bulkhead