4.
If fuel lines or hose clamps are found to be damaged, the
corresponding parts must be immediately repaired or
replaced by authorized service personnel.
NOTICE!
Danger of engine damage!
–
After work on the fuel system bleed the
system, perform a test run and check for
leaks.
8.8.9 Servicing the battery; checking the main battery shutoff
8.8.9.1
Battery service
Maintenance free batteries also need care. Mainte-
nance free only means that the fluid level does not
need to be checked.
Every battery has a self-discharge, which may, if
not checked occasionally, even cause damage to
the battery as a result of exhaustive discharge.
Exhausted batteries (batteries with formation of
sulphate on the plates) are not covered under war-
ranty!
Protective equipment:
n
Working clothes
n
Safety shoes
n
Protective gloves
n
Safety goggles
1.
Park the machine safely
Chapter 6.5 „Parking the machine
in secured condition“ on page 90
.
2.
Remove the battery and clean the battery compartment.
3.
Clean the outside of the battery.
4.
Clean the battery poles and terminals and grease them with
pole grease (Vaseline).
5.
Install the battery and check the battery fastening.
6.
Check the condition of the vibration insulation mats; replace if
necessary.
7.
On serviceable batteries check the acid level; if necessary,
top up to the filling mark with distilled water.
3
2
4
1
B-720-0055
Fig. 159
1
Terminal
2
Battery
3
Battery fastening
4
Vibration insulation mat
Maintenance – Every 250 operating hours/annually
D.ONE
125
Содержание D.ONE
Страница 2: ...2...
Страница 7: ...1 Introduction Introduction D ONE 7...
Страница 11: ...2 Technical data Technical data D ONE 11...
Страница 16: ...Technical data Noise data D ONE 16...
Страница 17: ...3 Concerning your safety Concerning your safety D ONE 17...
Страница 50: ...Concerning your safety Signage D ONE 50...
Страница 51: ...4 Indicators and control elements Indicators and control elements D ONE 51...
Страница 60: ...Indicators and control elements Remote control D ONE 60...
Страница 61: ...5 Checks prior to start up Checks prior to start up D ONE 61...
Страница 69: ...6 Operation Operation D ONE 69...
Страница 95: ...7 Loading transporting the machine Loading transporting the machine D ONE 95...
Страница 101: ...8 Maintenance Maintenance D ONE 101...
Страница 142: ...Maintenance As required D ONE 142...
Страница 143: ...9 Setting up refitting Setting up refitting D ONE 143...
Страница 148: ...Setting up refitting Teaching the BOSS safety field system D ONE 148...
Страница 149: ...10 Troubleshooting Troubleshooting D ONE 149...
Страница 167: ...11 Disposal Disposal D ONE 167...
Страница 169: ...12 Appendix Appendix D ONE 169...
Страница 189: ......
Страница 190: ......