The recovery tank is full
when the sewage in the recovery tank reaches the warning water level,
the machine will alarm automatically, the indicator light will be on, and
after a few seconds, the water suction system will be closed and the
brush system will be closed,
You must empty the recovery tank
.
Drain out methods
the sewage outfall is pulled out from the pipe rack, the drainage hose to
the height above the sewage outfall to unscrew the lid (to prevent the
drain cover open and sewage overflow) sewage hose down, the
completion of the sewage discharge.
Operation
the machine is equipped with system electronic control equipment, easy
to operate, only the following procedures can operate
1. turn the key clockwise to turn on the main power supply. (turn
the key counterclockwise and turn off)
2.select the direction of operation, forward or backward, step down the
operation control switch, the machine can start operation.
When the sewage pipe is put into the pipe rack, the
pipe frame adhesive bar is pulled out first, and then
the pipe is pushed into the position with glue tape.
When an emergency occurs, you can turn off the key
switch, step on the brake pedal or pull down the
emergency shutdown switch to stop the machine
running in the shortest possible time.
When the machine action is abnormal, the key switch can be
opened again, and the system will clean itself and restart;
To ensure safety, the machine is in a fallback state and
will shut down all working conditions. Please reselect
the work after completing the reverse adjustment.
Considering the possibility of serious pollution on
the factory floor, a drain plug for recovery tank has
been added. The device is opened after the drain
hose is opened, which can greatly reduce the
clogging of the sludge to the drainage pipe. When
used in a cleaner area, the device may not be used.
Emergency off switch
Key switch
USB Charging port
Headlight switch