- 4 -
Tools Required
3/8" Nut Driver
5/16" Nut Driver
When installing stainless steel hardware, it is suggested that
UMI-81343, UMI-81464, DXE-
NSBT8
or
DXE-NMBT8 - Never-Seez
or
Anti-Seize
be used to prevent thread galling.
Upper Assembly
1. The Upper assembly uses the following parts. Refer to
Figure 1
for an exploded view.
Quantity
Upper Assembly Parts Description
1
Stainless Steel Laser Cut 30 Meter AOK Mounting Arm
1
30 Meter AOK Hot Rodz Bracket.
1
30 Meter AOK Insulated Bracket # 1 (4 holes all same size)
2
Stainless Steel Hot Rodz™, 12"
2
2.25" Studded Element Clamp w/ Stainless Steel Hardware
2
Black Plastic End Cap for Hot Rodz™
6
# 10-24 x 3/4" Stainless Steel Carriage Bolt
4
# 10 Stainless Steel Flat Washer
1
# 10 x 1" x 0.62" thick Stainless Steel Fender washer
6
# 10 Stainless Steel Split Washer
1
# 10 Stainless Steel External Star Washer
5
# 10-24 Stainless Steel Hex Nut
1
# 10-24 Stainless Steel Wing Nut
Upper Assembly Parts
Содержание DXE-8040-30AOK
Страница 3: ...3 Figure 1 Overall Exploded Parts Drawing...
Страница 15: ...15 Notes...