![Dvorak SPIDER ILD01 G Скачать руководство пользователя страница 65](http://html1.mh-extra.com/html/dvorak/spider-ild01-g/spider-ild01-g_service-manual_2544108065.webp)
65
/
66
SM-1 Ev6/25062014
7.16 Charging and ignition cables
Charging:
voltage = 13,8 V
max. current = 13 A (FH 531) , 18 A (FH 500)
Ignition:
cable grounding ignition by STOP (If is cable disconnect, engine is impossible turn off)
Charging and ignition cables
Current measuring
7.17 Measuring list
Measuring current, voltage and resistance
Drains
Current
Voltage
Resistance
A
V
ohm
Solenoid carb.
0,4
12
40
Clutch-switch on
3,5
12
2,9
Charging (max)
13 (18)
12
Steering (max)
30
12
Linak
1 (down)
3 - 7 (up)
12
starter - relay coil
3
12
4,1
moving servo
max 2
12
engine rpm servo
6
panel
0,1
12
CU
2,1
12
Charging
Earthing of
ignition
coils