42
1 1 5 0 / 1 1 5 5 H A Y B U S T E R T U B G R I N D E R O P E R A T I N G I N S T R U C T I O N S
3.23 Preparing the 1150/1155 HAYBUSTER TUB GRINDER for operation
after transport
To prepare the 1150/1155 Haybuster Tub Grinder for operation after transport, perform the following steps:
1. Check the location.
• Are there power lines, branches, roof trusses, etc. that will obstruct the unfolding operation of the
conveyor and the loading operation of the tub?
• Position grinder to minimize the risk of thrown objects. For more information see section 1.6 on
page 15.
2. Turn the battery disconnect switch to “ON”.
3. Perform pre-operation inspection of the tub grinder.
4. Start the engine.
5. Lower the conveyor fully.
6. Unfold the top section of the discharge conveyor until it is fully extended. When unfolding the conveyor,
do not exceed an engine speed of 1000 RPM. Excessive engine RPM will cause the conveyor to fold too
fast and may cause damage.
7. Raise the conveyor to operating height.
3.24 Preparing the 1150/1155 HAYBUSTER TUB GRINDER for storage
To prepare the 1150/1155 HAYBUSTER TUB GRINDER for storage, perform the following steps:
1. The grinder has 4 pressure rollers with tapered roller bearings. These bearings should be regreased
annually.
2. Change the hydraulic oil and filter every 500 hours of operation.
3. To prevent rust and make inspection easier, thoroughly clean the machine.
4. Check for loose or worn chains, belts, sprockets and pulleys.
5. Check the condition of bearings.
6. Make sure that the batteries are fully charged before storing the unit, and turn the battery disconnect
switch to “OFF”.
7. Change the engine oil and filter.
Содержание Haybuster 1150
Страница 2: ...A Tradition of Innovation Since 1966 ...
Страница 4: ...A Tradition of Innovation Since 1966 ...