12
Preparation Before Use
Move the perforation tool assys.
(See
→
P.14 Changing the Perforation Tool Position)
Adjust the depth of the perforation tool.
(See
→
P.15 Changing the Perforation Tool Depth)
Tighten the two thumbscrews loosened in step 2.
Install the
perforation unit
on the ejection side of
the DC-616 by tightening the two perforation unit
installing screws..
Select a JOB containing perforation process and perform a test run for one sheet.
Check the processed positions on the
fi
nished product.
When you change the perforation positions, repeat steps 2 to 7.
Содержание DC-6 Mini
Страница 1: ......
Страница 2: ......
Страница 11: ...ix Notes on Safety Please Read and Observe No Part No Name Q ty 5 R7 T115 WARNING LABEL 1 5 ...
Страница 13: ...xi Notes on Safety Please Read and Observe Machine Dimensions and Required Space for Operation ...
Страница 16: ......
Страница 46: ......
Страница 60: ......
Страница 84: ......
Страница 95: ...79 Appendix Appendix This chapter lists an index Index 80 ...
Страница 98: ......
Страница 99: ......
Страница 100: ...S2 Y1830 2017 07 ...