45
• Remove ¼-20 hex
fl
ange nuts securing condensate
collector to heat exchanger using 7/16" deep well
socket. See
fi
gures 11-3 & 11-4.
• Remove condensate collector assembly from heat
exchanger and
fl
ue pipe.
• Flush collector and condensate trap with water.
• Follow Burner Inspection Kit instructions to reassemble
boiler and resume operation.
11 - GENERAL MAINTENANCE AND CLEANING
Содержание DKVLT-050
Страница 47: ...47 13 TROUBLE SHOOTING ...
Страница 51: ...51 13 TROUBLE SHOOTING ...
Страница 53: ...53 13 TROUBLE SHOOTING ...
Страница 62: ...62 Supply Water Temperature Sensor Resistance Chart 13 TROUBLE SHOOTING ...
Страница 64: ...64 14 WIRING DIAGRAM 14 1 Connection Diagram 050 075 100 150 200 MBH ...
Страница 66: ...66 14 WIRING DIAGRAM 14 3 Connection Diagram 299 MBH EXTERNAL PUMP RELAY LIMIT OF 1 AMP PER PUMP SEE SECTION 8 ...
Страница 83: ...83 NOTES ...
Страница 84: ...ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...