6.9 Condensate Piping
• Use materials acceptable to authority having jurisdiction.
In absence of such authority:
• USA - PVC or CPVC per ASTM D1785/D2845 Cement
or primer per ASME D2564 or F493.
• Canada - CSA or ULC certi
fi
ed PVC/CPVC pipe,
fi
ttings and cement.
• Attach PVC tee provided with boiler and
fi
eld sourced
piping to condensate drain at bottom of boiler. See
fi
gure 6-18.
• Slope condensate drain pipe minimum 1/4" per foot
(21mm/m) away from boiler.
• Use
fi
eld source condensate pump if boiler located
below disposal point.
• Field source condensate neutralizing kit as required
by authority having jurisdiction or for environmentally
friendly condensate disposal.
FIGURE 6-18 Condensate Drain
Condensate Tee
(
fi
eld installed)
on condensate drain pipe
Do not glue cap on if used
for dust protection. End
must be left open.
Do not place in environment with
temperatures below freezing.
Condensate outlet will block if
condensate freezes.
6 - COMBUSTION AIR AND VENT PIPING
Содержание DKVLT-050
Страница 47: ...47 13 TROUBLE SHOOTING ...
Страница 51: ...51 13 TROUBLE SHOOTING ...
Страница 53: ...53 13 TROUBLE SHOOTING ...
Страница 62: ...62 Supply Water Temperature Sensor Resistance Chart 13 TROUBLE SHOOTING ...
Страница 64: ...64 14 WIRING DIAGRAM 14 1 Connection Diagram 050 075 100 150 200 MBH ...
Страница 66: ...66 14 WIRING DIAGRAM 14 3 Connection Diagram 299 MBH EXTERNAL PUMP RELAY LIMIT OF 1 AMP PER PUMP SEE SECTION 8 ...
Страница 83: ...83 NOTES ...
Страница 84: ...ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...