41
9-8 Control Module J7 Connector
J7 Connector
J7 Connector
9.7 Complete Start Up Procedure
1.
Reset control parameters to operating settings if
adjusted to allow startup and operation test.
2.
Follow instructions TO TURN OFF GAS TO APPLIANCE
(page 42) if boiler is not being placed into
immediate operation.
3.
Enter installer information on Warranty Registration
Card.
4.
Gather all instructions, manuals, wiring diagrams,
warranty registration card and other supporting
information. Review with user and/or af
fi
x in
conspicuous location adjacent to boiler.
9 - START UP PROCEDURE
Содержание DKVLT-050
Страница 47: ...47 13 TROUBLE SHOOTING ...
Страница 51: ...51 13 TROUBLE SHOOTING ...
Страница 53: ...53 13 TROUBLE SHOOTING ...
Страница 62: ...62 Supply Water Temperature Sensor Resistance Chart 13 TROUBLE SHOOTING ...
Страница 64: ...64 14 WIRING DIAGRAM 14 1 Connection Diagram 050 075 100 150 200 MBH ...
Страница 66: ...66 14 WIRING DIAGRAM 14 3 Connection Diagram 299 MBH EXTERNAL PUMP RELAY LIMIT OF 1 AMP PER PUMP SEE SECTION 8 ...
Страница 83: ...83 NOTES ...
Страница 84: ...ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...