background image

 

 

 

 

Screw in the pumping elements and tighten with a torque of 10 Nm using a 12mm socket spanner. 

 

Screw in the caps into the remaining holes and tighten with a  torque of 10 Nm using  a  12mm  socket  spanner or a 
6mm Allen wrench. 
 

 
 
 
 
 
 
 
 
6.3 INSTALLATION OF THE PUMP 

 

Place the pump and fasten to its support by using the appropriate Ø6.5 mm holes (0.256in), with 4 suitable screws. 

 

Assemble the pump in such a way that the grease nipple for filling the reservoir is easily accessible. 

 

Leave at least 100 mm (3.93 in) as a perimeter distance with respect to other equipment or barriers to prevent access 
to the pump (in the case of cartridge filling, provide for adequate distances). 

 

Assemble the pump at “labourer height” in order to prevent abnormal posture or possible impact. 

 

Do not install the pump submerged in liquids and/or in aggressive environments. 

 

Do not install the pump in environments where there are explosive or flammable mixtures. 

 

Do not install the pump near sources of heat or near electrical equipment that can disturb the electronics and prevent 
them from functioning properly. 

 

Ensure that the pipes and wires have been properly fastened and protected from any possible impact. 

 

Verify  that  the  grease  used  is  fit  for  operating  temperatures,  especially  at  temperatures  below  0°  C.  If  in  doubt, 
contact our Sales Technical Office for the correct choice of lubricant. 

 

6.4 HYDRAULIC CONNECTIONS 

The  hydraulic  connection  between  the  pump  and  the  system  is  on  the  pumping  element  with  a  pipe  push-in  Ø4mm 
(5/32in). The return to pump can be carried out through the M22x1 threading that is present. 
 
 
 
 
 

 
6.5 ELECTRICAL CONNECTION 
 
 
 
 

 
The  electrical  connection  is  the  responsibility  of  the  user  and  must  provide  for  the  unique  identification  of  the  power 
connection. 
Connect the machine to the electrical power line as indicated in the present manual. 
The power cable must have suitable thickness with regard to the absorption of the machine and type in accordance with 
regulations in force. 
 

6.5.1 Connection diagram 

 
 
 
 
 
 
 
 
 

ATTENTION

:

  Verify  the  correspondence  between  the  electrical  power  supply  of  the  pump  and  of  the 

machine (label affixed to the side of the pump.) 

 

 

ATTENTION

:

  Introduce  the  pumping  element  into  the  predetermined  output  pumping  element  paying 

particular attention to correct engagement into the thread. 

 

 

ATTENTION

:

 The pipeline must reach the point of lubrication along the shortest route possible. 

 

 

Содержание PoliPUMP eco

Страница 1: ...ng and Maintenance Manual Original Instructions Manual drawn up in accordance with EC Directive 06 42 C2291IE WK 24 19 Dropsa products can be purchased from Dropsa bracnhes and authorized distributors...

Страница 2: ...UNPACKING 6 6 2 INSTALLATION OF PUMPING ELEMENTS CAPS 6 7 OPERATING INSTRUCTIONS 8 7 1 MEASURES TO BE TAKEN PRIOR TO START UP 8 7 2 USE 9 7 3 FILLING THE RESERVOIR 9 8 PROBLEMS AND SOLUTIONS 10 9 MAIN...

Страница 3: ...ions and in various types of machinery for use with grease Any use other than the use intended shall be deemed to be in non compliance with requirements 2 2 SPECIFICATIONS The PoliPUMP eco electric pu...

Страница 4: ...pumping element 80bar 1 160psi Reservoir capacity 2 litres 0 53 gallons Grease consistency NLGI00 NLGI2 Protection degree IP 69 Temperature of use 10 C 60 C 14 F 140 F Storage temperature 20 C 80 C 4...

Страница 5: ...GREY 5 notches 0 10cc cycle BLACK 6 notches 0 13cc cycle Push in outlet 4 Notches Pump replacement cap included within the scope of supply Stirring paddle with wiper reservoir Input power cable gland...

Страница 6: ...ition by distributing them evenly over the holes on the pumping element holder cylinder No MOUNTING POSITIONS No MOUNTING POSITIONS No MOUNTING POSITIONS 1 1 13 13 25 25 2 1 7 14 13 19 26 25 31 3 1 5...

Страница 7: ...e pipes and wires have been properly fastened and protected from any possible impact Verify that the grease used is fit for operating temperatures especially at temperatures below 0 C If in doubt cont...

Страница 8: ...temperature and that the pipelines are free of any air bubbles Check the correct connection of electrical devices To determine the maximum operating pressure it is necessary to know the pressure drop...

Страница 9: ...the maximum level line If this happens you will note a spill of lubricant from the underside of the lid which acts as an air vent 7 4 HOW TO USE If there are no regulations foreseen the pump is electr...

Страница 10: ...e time The pump begins the greasing phase but ends it immediately Defective motor or high output absorption Allow to cool for a few minutes and try again If the problem persists replace the gear motor...

Страница 11: ...s the periodic inspections the frequency and the intervention that the maintenance will have to carry out in order to ensure the efficiency of the system over time CHECK FREQUENCY INTERVENTION Attachm...

Страница 12: ...888274 ECO 0888275 ECO 0 04cc cy cle 0888453 0 13cc cycle 0888456 OPTIONAL SPARE PARTS PART NUMBER DESCRIPTION PART NUMBER DESCRIPTION 5717300 Nylon tube 4x3 low pressure 0888257 Pump replacement cap...

Страница 13: ...ND TRANSPORT Before shipment the pumps are carefully packed inside a cardboard box During transport and storage of the equipment pay attention to the direction indicated on the box Upon receipt check...

Страница 14: ...ISO 12100 Electrical safety requirements EN 60204 1 The hazards that have not been entirely eliminated but that have been deemed acceptable are listed below During the maintenance phase low pressure s...

Отзывы: