12
3.3.1. Lifting and Transport
3.3.1.1 Residual risks present in the Lifting and Transport Phases
In the lifting and transport phases, risks are present connected to:
operations on the 989
V
2 by unqualified, untrained, uninformed or incorrectly equipped
personnel;
incorrect selection of incorrect use of the means of transport and handling of the components
of the 989
V
2;
crushing / impact of the operators in charge of handling;
loss of load stability during lifting and transport operations;
impact of parts or components of the 989
V
2 with people or objects due to improper behaviour by personnel
tasked with the operation;
impact or falling of the 989
V
2, damaging the 989
V
2 itself;
unhealthy positions or excessive strain for the operators tasked with transport and handling the components of
the 989
V
2.
3.3.1.2. Required Personal Protection Equipment
3.3.1.3. Warnings to be heeded in the Lifting and Transport Phases
In the lifting and transport phases, the warnings in this paragraph must be heeded.
For these operations, assign only
specialised personnel trained
on handling and transport
procedures, capable of safely using the lifting and transport equipment and choosing the most
suitable paths for the circumstances.
Ensure ahead of time that
moving parts
of the 989
V
2 have been secured or removed.
Ensure ahead of time that the
electrical power supply
of the 989
V
2 is
disconnected
.
Only use a
suitable system to grip, lift / lower and transport
the 989
V
2 to the installation
point. The
MACHINE
has
limited dimensions
and a
weight
of
15 kg
or
18 kg
, depending on
whether it is fitted respectively with a 5 kg or 10 kg grease reservoir.
Always handle the
MACHINE
with the reservoir completely empty.