19
3.
Ensure the pressure lines are properly connected from the Controller to the appropriate Master
Meter. One end of the blue inlet Pressure Line will connect into the selected Master Meter’s inlet
pressure fitting and the other end connects into the inlet pressure port on the Controller
(labeled IN PRESS). In a similar fashion, one end of the black outlet Pressure Line will connect
into the selected Master Meter’s outlet pressure fitting and the other end connects into the outlet
pressure port on the Controller (labeled OUT PRESS).
Electrical power to the Model 5 Prover must be off.
4.
If not already factory connected, connect the Master Meter Cable to the appropriate Master
Meter Junction Box for the Master Meter being used. Connect the other end of the Master Meter
Cable to the connector labeled MASTER METER on the Controller. See page 3 and 4 for the
Master Meters and their attached Junction Boxes.
5.
Connect the 12 pin Field Meter Junction Box cable connector to the mating 12 pin connector
labeled FIELD CABLE on the Controller.
6.
Install the P&T (Pressure & Temperature) Adapter into the inlet pressure port for rotary and
diaphragm meters and at the outlet pressure port for turbine meters.
7.
Install the Field Meter Pressure Adapter into the outlet pressure port of the Field Meter
for rotary and diaphragm meters.
8.
Insert the Field Meter Temperature Probe into the P&T Adapter’s vertical port until the
Temperature Probe is in the center of the air stream - then hand tighten the compression fitting.
If installing the P&T Adapter into the top of a diaphragm meter, do not to extend the probe to
the point where it will engage with the tangent linkage. If opening is not available, install probe in
the pipe line as close to meter outlet as possible.
Make sure that the Field Meter Temperature Probe or the meter being tested cannot be damaged due to
the positioning of the Field Meter Temperature Probe. Avoid leakage at or around the P&T Adapter or
Field Meter Temperature Probe.
9.
Plug the end of the Field Meter Temperature Probe cable into the Field Meter Junction Box
connection labeled TEMP. The Field Meter Junction Box is shown in on page 3 and 4.
Figure 2: Instrument Drive Pulser test set-up.